15t Spout Electric Arc Furnace Price 6mva Furnace Transformer
HomeHome > Products > Furnace Transformer > 15t Spout Electric Arc Furnace Price 6mva Furnace Transformer
15t Spout Electric Arc Furnace Price 6mva Furnace Transformer

15t Spout Electric Arc Furnace Price 6mva Furnace Transformer

1. Main technical parameters 2. Scope of Supply Supplied by the Buyer:1) Installation and installation material, furnace
Basic Info
Model NO. 15ton 6000kva
Transport Package Nude, Wooden Cases
Specification As per drawing
Trademark Ville Industry
Origin China
HS Code 851300020
Production Capacity 30units Per Year
Product Description
1. Main technical parameters
SNDescriptionUnitData
1Rated capacityT15t
2Steel tappingT15-20t
3Diameter of shellmmΦ3700
4Electrode pitch circle diametermmΦ950
5Electrode diametermmΦ350 (RP)
6Electrode travel strokemm2600
7Electrode lifting speed(up/down)m/min6/4
8Electrode traveling mechanism Motor, VVVF
9Max. steel tapping angle (forward)degree42°
10Max. slag tapping angle (backward)degree12°
11Max. roof swivel angledegree60°
12Roof lifting strokemm400
13Transformer capacity with water/oil coolerMVA6
14Transformer primary voltagekV20
15Transformer secondary voltageV260 - 139
16Transformer tap changer 5 steps, off-load
17Transformer secondary currentA13,324
18Electrode lifting mode Hydraulic
19Cooling water circulating flowT/h150
2. Scope of Supply
SNItemQtyRemark
1Furnace body1 set
2Tilting mechanism1 set
3Water-cooled roof1 set
4Roof lifting & swivel mechanism1 set
5Conductive arms1 set
6Electrode lifting mechanism1 set
7Cooling water distributor1 set
8Hydraulic power pack1 setProportional valve and pump make: Parker
9Short net1 set
10L.V. Control system1 set
11PLC control system & HMI1 setSiemens S7-300
12 6MVA Furnace transformer with water/oil cooler1 set
13Compressed air device1 set
1410kV H.V. switchboard1 set
Supplied by the Buyer:1) Installation and installation material, furnace refractory lining, hydraulic medium, lubrication medium and cleaning medium, graphite electrodes;2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace foundation parts;3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is connected to seller's H.V. switchboard and Transformer terminals, L.V. supply lines are connect to Seller's L.V. power distribution panel.3. Delivery: 4 month after date receiving down payment.WorkshopSales team: